| Links Return Links Glossary Contact Info     | All Copper Sampling Results
 
  
    | 
      
        | Water System No. : | CA2901208 | Federal Type : | NTNC |  
        | Water System Name : | DONNER TRAIL ELEMENTARY SCHOOL | State Type : | NTNC |  
        | Principal County Served : | NEVADA | Primary Source : | GW |  
        | Status : | A | Activity Date : | 08-08-2016 |  
        | Distribution System Classification : | D1 | Max Treatment Plant Classification : | T1 |  |  
 
  
 
 
 
 
 
Click to hide / show columns: 
Sample No. | Site | 
Date | Result | 
Units | Analyte | 
Location | Laboratory|  
      
      
        | Sample No. | Site | Date | Result | Units | Analyte | Location | Laboratory | Sample No. | Site | Date | Result | Units | Analyte | Location | Laboratory | 
	| 6173255-1 | LCR | 09-28-2017 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| 6173255-2 | LCR | 09-28-2017 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| 6173255-3 | LCR | 09-28-2017 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| 6173255-4 | LCR | 09-28-2017 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| 6173255-5 | LCR | 09-28-2017 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| GFI0484-01 | LCR | 09-01-2023 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| GFI0484-02 | LCR | 09-01-2023 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| GFI0484-03 | LCR | 09-01-2023 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| GFI0484-04 | LCR | 09-01-2023 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  
	| GFI0484-05 | LCR | 09-01-2023 | 0 |  | COPPER, FREE | LCR | CRANMER ENGINEERING, INC. |  |