CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA3500581 Federal Type : C
Water System Name : RANCHO SAN JOAQUIN MWC State Type : C
Principal County Served : SAN BENITO Primary Source : GW
Status : A Activity Date : 01-01-1991
Distribution System Classification : D1 Max Treatment Plant Classification : TD

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2022-2024 01-01-2022 12-31-2024 90 5 0 MG/L PB90 - LEAD SUMMARY 07-14-2024 07-17-2024
3Y2022-2024 01-01-2022 12-31-2024 90 5 0.268 MG/L CU90 - COPPER SUMMARY 07-14-2024 07-17-2024
3Y2019-2021 01-01-2019 12-31-2021 90 12 0 MG/L PB90 - LEAD SUMMARY 06-22-2021 06-22-2021
3Y2019-2021 01-01-2019 12-31-2021 90 12 0.334 MG/L CU90 - COPPER SUMMARY 06-22-2021 06-22-2021
YR2018 01-01-2018 12-31-2018 90 5 0.002 MG/L PB90 - LEAD SUMMARY 09-14-2018 09-15-2018
YR2018 01-01-2018 12-31-2018 90 5 0.261 MG/L CU90 - COPPER SUMMARY 09-14-2018 09-15-2018
YR2014 01-01-2014 12-31-2014 90 20 MG/L PB90 - LEAD SUMMARY 09-30-2014 09-30-2014
YR2014 01-01-2014 12-31-2014 90 20 0.4 MG/L CU90 - COPPER SUMMARY 09-30-2014 09-30-2014
YR2013 01-01-2013 12-31-2013 90 20 0 MG/L PB90 - LEAD SUMMARY 09-28-2013 09-30-2013
YR2013 01-01-2013 12-31-2013 90 20 0.54 MG/L CU90 - COPPER SUMMARY 09-28-2013 09-30-2013
YR2002 01-01-2002 12-31-2002 90 20 0.69 MG/L CU90 - COPPER SUMMARY 08-01-2002 08-01-2002
YR2002 01-01-2002 12-31-2002 90 20 0 MG/L PB90 - LEAD SUMMARY 08-01-2002 08-01-2002
YR2000 01-01-2000 12-31-2000 90 20 0.63 MG/L CU90 - COPPER SUMMARY 05-23-2000 05-23-2000
YR2000 01-01-2000 12-31-2000 90 20 0.009 MG/L PB90 - LEAD SUMMARY 05-23-2000 05-23-2000

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)