CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA3301381 Federal Type : C
Water System Name : CSA 51 State Type : C
Principal County Served : RIVERSIDE Primary Source : GW
Status : A Activity Date : 07-27-2016
Distribution System Classification : D1 Max Treatment Plant Classification : T1

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2020-2022 01-01-2020 12-31-2022 90 5 0 MG/L PB90 - LEAD SUMMARY 08-23-2022 08-25-2022
3Y2020-2022 01-01-2020 12-31-2022 90 5 0.094 MG/L CU90 - COPPER SUMMARY 08-23-2022 08-25-2022
3Y2017-2019 01-01-2017 12-31-2019 90 5 0 MG/L PB90 - LEAD SUMMARY 07-09-2019 07-10-2019
3Y2017-2019 01-01-2017 12-31-2019 90 5 0.04350 MG/L CU90 - COPPER SUMMARY 07-09-2019 07-10-2019
3Y2014-2016 01-01-2014 12-31-2016 90 5 0.211 MG/L CU90 - COPPER SUMMARY 08-08-2016 08-19-2016
3Y2014-2016 01-01-2014 12-31-2016 90 5 0 MG/L PB90 - LEAD SUMMARY 08-08-2016 08-19-2016
3Y2011-2013 01-01-2011 12-31-2013 90 5 0.121 MG/L CU90 - COPPER SUMMARY 08-14-2013 08-14-2013
3Y2011-2013 01-01-2011 12-31-2013 90 5 0 MG/L PB90 - LEAD SUMMARY 08-14-2013 08-14-2013

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)