CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA1010062 Federal Type : C
Water System Name : FCWWD #18/MIRA BELLA State Type : C
Principal County Served : FRESNO Primary Source : GW
Status : A Activity Date : 06-08-2018
Distribution System Classification : D1 Max Treatment Plant Classification : T1

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP *MP BeginMP EndType# SamplesMeasureUnitsAnalyte Code/NameBegin SamplingEnd Sampling
3Y2023-2025 01-01-2023 12-31-2025 90 5 0.006 MG/L PB90 - LEAD SUMMARY 09-26-2024 09-26-2024
3Y2023-2025 01-01-2023 12-31-2025 90 5 0.041 MG/L CU90 - COPPER SUMMARY 09-26-2024 09-26-2024
6M2ND-2018 07-01-2018 12-31-2018 90 10 0 MG/L PB90 - LEAD SUMMARY 09-20-2018
6M2ND-2018 07-01-2018 12-31-2018 90 10 0.140 MG/L CU90 - COPPER SUMMARY 09-20-2018
6M2ND-2019 07-01-2019 12-31-2019 90 10 0.013 MG/L PB90 - LEAD SUMMARY 08-13-2019 08-28-2019
6M2ND-2019 07-01-2019 12-31-2019 AL 1 exceeding Action Level --- --- PB90 - LEAD SUMMARY 08-13-2019 08-28-2019
6M2ND-2019 07-01-2019 12-31-2019 90 10 0.110 MG/L CU90 - COPPER SUMMARY 08-13-2019 08-28-2019
YR2020 01-01-2020 12-31-2020 90 10 0 MG/L PB90 - LEAD SUMMARY 06-01-2020 06-03-2020
YR2020 01-01-2020 12-31-2020 90 10 0.063 MG/L CU90 - COPPER SUMMARY 06-01-2020 06-03-2020
YR2021 01-01-2021 12-31-2021 90 10 0 MG/L PB90 - LEAD SUMMARY 07-18-2021 07-26-2021
Showing 1 to 10 of 13 entries

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)