CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA4000837 Federal Type : NTNC
Water System Name : PLAYA DULCE State Type : NTNC
Principal County Served : SAN LUIS OBISPO Primary Source : GW
Status : A Activity Date : 01-07-2021
Distribution System Classification : D1 Max Treatment Plant Classification : There are no treatment plants

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
6M2ND-2021 07-01-2021 12-31-2021 90 5 0.034 MG/L CU90 - COPPER SUMMARY 10-01-2021 10-01-2021
6M2ND-2021 07-01-2021 12-31-2021 90 5 0 MG/L PB90 - LEAD SUMMARY 10-01-2021 10-01-2021
6M2ND-2021 07-01-2021 12-31-2021 90 5 0.034 MG/L CU90 - COPPER SUMMARY 10-01-2021 10-01-2021
6M1ST-2021 01-01-2021 06-30-2021 90 5 0 MG/L PB90 - LEAD SUMMARY 03-09-2021 03-09-2021
6M1ST-2021 01-01-2021 06-30-2021 90 5 0.375000 MG/L CU90 - COPPER SUMMARY 03-09-2021 03-09-2021

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)