CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA1000021 Federal Type : C
Water System Name : FCSA #05/WILDWOOD ISLAND State Type : C
Principal County Served : FRESNO Primary Source : GW
Status : A Activity Date : 03-22-1979
Distribution System Classification : D1 Max Treatment Plant Classification : T1

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP *MP BeginMP EndType# SamplesMeasureUnitsAnalyte Code/NameBegin SamplingEnd Sampling
3Y2009-2011 01-01-2009 12-31-2011 90 5 0.0027 MG/L PB90 - LEAD SUMMARY 09-23-2011 09-23-2011
3Y2009-2011 01-01-2009 12-31-2011 90 5 0.092 MG/L CU90 - COPPER SUMMARY 09-23-2011 09-23-2011
3Y2012-2014 01-01-2012 12-31-2014 90 5 0.01 MG/L PB90 - LEAD SUMMARY 08-14-2014 08-14-2014
3Y2012-2014 01-01-2012 12-31-2014 AL 1 exceeding Action Level --- --- PB90 - LEAD SUMMARY 08-14-2014 08-14-2014
3Y2012-2014 01-01-2012 12-31-2014 90 5 0.005 MG/L CU90 - COPPER SUMMARY 08-14-2014 08-14-2014
3Y2015-2017 01-01-2015 12-31-2017 90 5 0.005 MG/L PB90 - LEAD SUMMARY 12-14-2017 12-14-2017
3Y2015-2017 01-01-2015 12-31-2017 90 5 0.011 MG/L CU90 - COPPER SUMMARY 12-14-2017 12-14-2017
3Y2019-2021 01-01-2019 12-31-2021 90 5 0.0061 MG/L PB90 - LEAD SUMMARY 08-28-2021 08-28-2021
3Y2019-2021 01-01-2019 12-31-2021 90 5 0.014 MG/L CU90 - COPPER SUMMARY 08-28-2021 08-28-2021
3Y2022-2024 01-01-2022 12-31-2024 90 8 0.026 MG/L PB90 - LEAD SUMMARY 08-15-2024 08-15-2024
Showing 1 to 10 of 22 entries

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)