CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA1200541 Federal Type : C
Water System Name : PHILLIPSVILLE C.S.D. State Type : C
Principal County Served : HUMBOLDT Primary Source : GW
Status : A Activity Date : 03-22-1979
Distribution System Classification : D1 Max Treatment Plant Classification : T2

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2022-2024 01-01-2022 12-31-2024 90 5 0.00438 MG/L PB90 - LEAD SUMMARY 08-09-2022 08-09-2022
3Y2022-2024 01-01-2022 12-31-2024 90 5 0.04474 MG/L CU90 - COPPER SUMMARY 08-09-2022 08-09-2022
3Y2016-2018 01-01-2016 12-31-2018 90 10 0.0073 MG/L PB90 - LEAD SUMMARY 09-30-2018 09-30-2018
3Y2016-2018 01-01-2016 12-31-2018 90 10 0.260 MG/L CU90 - COPPER SUMMARY 09-30-2018 09-30-2018
6M2ND-2013 07-01-2013 12-31-2013 90 11 0.0044 MG/L PB90 - LEAD SUMMARY 08-21-2013 08-21-2013
6M2ND-2013 07-01-2013 12-31-2013 90 11 0.16 MG/L CU90 - COPPER SUMMARY 08-21-2013 08-21-2013
3Y2013-2015 01-01-2013 12-31-2015 90 8 0.24 MG/L CU90 - COPPER SUMMARY 09-29-2015 09-29-2015
3Y2013-2015 01-01-2013 12-31-2015 AL 1 exceeding Action Level --- --- PB90 - LEAD SUMMARY 09-29-2015 09-29-2015
3Y2013-2015 01-01-2013 12-31-2015 90 8 0.0087 MG/L PB90 - LEAD SUMMARY 09-29-2015 09-29-2015
3Y2011-2013 01-01-2011 12-31-2013 90 11 0.0037 MG/L PB90 - LEAD SUMMARY 04-30-2013 04-30-2013
3Y2011-2013 01-01-2011 12-31-2013 90 11 0.2 MG/L CU90 - COPPER SUMMARY 04-30-2013 04-30-2013
6M1ST-2005 01-01-2005 06-30-2005 90 10 0 MG/L PB90 - LEAD SUMMARY 02-01-2005 02-01-2005
6M1ST-2005 01-01-2005 06-30-2005 90 10 0.036 MG/L CU90 - COPPER SUMMARY 02-01-2005 02-01-2005
6M1ST-2002 01-01-2002 06-30-2002 90 10 0.2 MG/L CU90 - COPPER SUMMARY 05-28-2002 05-28-2002
6M1ST-2002 01-01-2002 06-30-2002 90 10 0.0063 MG/L PB90 - LEAD SUMMARY 05-28-2002 05-28-2002

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)