Links
Return Links
Glossary
Contact Info
|
Lead and Copper Sample Summary Results
Water System No. : |
CA1206012 |
Federal Type : |
NTNC |
Water System Name : |
WHITETHORN CONSTRUCTION |
State Type : |
NTNC |
Principal County Served : |
HUMBOLDT |
Primary Source : |
SW |
Status : |
A |
Activity Date : |
01-01-2017 |
Distribution System Classification : |
NR |
Max Treatment Plant Classification : |
T2 |
|
Click to hide / show columns:
MP | MP Begin |
MP End | Type |
# Samples | Measure |
Units | Analyte Code/Name |
Begin Sampling| End Sampling
MP * |
MP Begin |
MP End |
Type |
# Samples |
Measure |
Units |
Analyte Code/Name |
Begin Sampling |
End Sampling |
MP * |
MP Begin |
MP End |
Type |
# Samples |
Measure |
Units |
Analyte Code/Name |
Begin Sampling |
End Sampling |
6M2ND-2023 |
07-01-2023 |
12-31-2023 |
90 |
5 |
0.00615 |
MG/L |
PB90 - LEAD SUMMARY |
08-31-2023 |
09-01-2023 |
6M2ND-2023 |
07-01-2023 |
12-31-2023 |
90 |
5 |
0.40000 |
MG/L |
CU90 - COPPER SUMMARY |
08-31-2023 |
09-01-2023 |
6M1ST-2022 |
01-01-2022 |
06-30-2022 |
90 |
5 |
0.00720 |
MG/L |
PB90 - LEAD SUMMARY |
04-05-2022 |
04-05-2022 |
6M1ST-2022 |
01-01-2022 |
06-30-2022 |
90 |
5 |
0.46784 |
MG/L |
CU90 - COPPER SUMMARY |
04-05-2022 |
04-05-2022 |
6M2ND-2020 |
07-01-2020 |
12-31-2020 |
AL |
1 exceeding Action Level |
--- |
--- |
PB90 - LEAD SUMMARY |
09-27-2020 |
09-27-2020 |
6M2ND-2020 |
07-01-2020 |
12-31-2020 |
90 |
5 |
0.0140 |
MG/L |
PB90 - LEAD SUMMARY |
09-27-2020 |
09-27-2020 |
6M2ND-2020 |
07-01-2020 |
12-31-2020 |
90 |
5 |
0.295000 |
MG/L |
CU90 - COPPER SUMMARY |
09-27-2020 |
09-27-2020 |
6M2ND-2019 |
07-01-2019 |
12-31-2019 |
90 |
5 |
0.0035 |
MG/L |
PB90 - LEAD SUMMARY |
12-17-2019 |
12-17-2019 |
6M2ND-2019 |
07-01-2019 |
12-31-2019 |
90 |
5 |
0.335000 |
MG/L |
CU90 - COPPER SUMMARY |
12-17-2019 |
12-17-2019 |
* MP is monitoring period which can be triennial (3Y), annual (YR), 1st
six months (6M1ST), or 2nd six months (6M2ND)
|