CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA2010015 Federal Type : NTNC
Water System Name : WP&A-FIREBAUGH WATER SYSTEM State Type : NTNC
Principal County Served : MADERA Primary Source : SW
Status : A Activity Date : 12-27-2013
Distribution System Classification : D1 Max Treatment Plant Classification : T2

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2020-2022 01-01-2020 12-31-2022 90 5 0 MG/L PB90 - LEAD SUMMARY 06-21-2022 06-21-2022
3Y2020-2022 01-01-2020 12-31-2022 90 5 0 MG/L CU90 - COPPER SUMMARY 06-21-2022 06-21-2022
3Y2017-2019 01-01-2017 12-31-2019 90 5 0 MG/L PB90 - LEAD SUMMARY 07-29-2019 07-29-2019
3Y2017-2019 01-01-2017 12-31-2019 90 5 0.26 MG/L CU90 - COPPER SUMMARY 07-29-2019 07-29-2019
YR2016 01-01-2016 12-31-2016 90 5 MG/L PB90 - LEAD SUMMARY 07-27-2016 07-27-2016
YR2016 01-01-2016 12-31-2016 90 5 0.119 MG/L CU90 - COPPER SUMMARY 07-27-2016 07-27-2016
6M2ND-2015 07-01-2015 12-31-2015 90 5 0.127 MG/L CU90 - COPPER SUMMARY 08-27-2015 08-27-2015
6M2ND-2015 07-01-2015 12-31-2015 90 5 MG/L PB90 - LEAD SUMMARY 08-27-2015 08-27-2015
6M1ST-2015 01-01-2015 06-30-2015 90 5 0.097 MG/L CU90 - COPPER SUMMARY 03-03-2015 03-03-2015
6M1ST-2015 01-01-2015 06-30-2015 90 5 MG/L PB90 - LEAD SUMMARY 03-03-2015 03-03-2015

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)