CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA1503361 Federal Type : NP
Water System Name : CAL MAT - PANAMA LANE FACILITY State Type : NTNC
Principal County Served : KERN Primary Source :
Status : I Activity Date : 08-16-2016
Distribution System Classification : Max Treatment Plant Classification : There are no treatment plants

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2011-2013 01-01-2011 12-31-2013 90 5 0.155 MG/L CU90 - COPPER SUMMARY 08-29-2013 08-29-2013
3Y2011-2013 01-01-2011 12-31-2013 90 5 0 MG/L PB90 - LEAD SUMMARY 08-29-2013 08-29-2013
6M1ST-2008 01-01-2008 06-30-2008 90 5 0.056 MG/L CU90 - COPPER SUMMARY 04-07-2008 04-07-2008
6M1ST-2008 01-01-2008 06-30-2008 90 5 0.0028 MG/L PB90 - LEAD SUMMARY 04-07-2008 04-07-2008
6M2ND-2004 07-01-2004 12-31-2004 90 5 0.004 MG/L PB90 - LEAD SUMMARY 07-29-2004 07-29-2004
6M2ND-2004 07-01-2004 12-31-2004 90 5 0.0053 MG/L CU90 - COPPER SUMMARY 07-29-2004 07-29-2004

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)