CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA4901162 Federal Type : NTNC
Water System Name : QUIVIRA VINEYARDS State Type : NTNC
Principal County Served : SONOMA Primary Source : GU
Status : A Activity Date : 12-08-1992
Distribution System Classification : D1 Max Treatment Plant Classification : T2

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
YR2023 01-01-2023 12-31-2023 90 5 0.0025 MG/L PB90 - LEAD SUMMARY 08-04-2023 08-04-2023
YR2023 01-01-2023 12-31-2023 90 5 1.015 MG/L CU90 - COPPER SUMMARY 08-04-2023 08-04-2023
6M2ND-2021 07-01-2021 12-31-2021 90 5 0 MG/L PB90 - LEAD SUMMARY 09-10-2021 09-10-2021
6M2ND-2021 07-01-2021 12-31-2021 90 5 0.885 MG/L CU90 - COPPER SUMMARY 09-10-2021 09-10-2021
6M1ST-2021 01-01-2021 06-30-2021 90 5 0 MG/L PB90 - LEAD SUMMARY 03-16-2021 03-16-2021
6M1ST-2021 01-01-2021 06-30-2021 90 5 1.055000 MG/L CU90 - COPPER SUMMARY 03-16-2021 03-16-2021
6M2ND-2020 07-01-2020 12-31-2020 90 6 0.296000 MG/L PB90 - LEAD SUMMARY 09-22-2020 11-05-2020
6M2ND-2020 07-01-2020 12-31-2020 AL 1 exceeding Action Level --- --- PB90 - LEAD SUMMARY 09-22-2020 11-05-2020
6M2ND-2020 07-01-2020 12-31-2020 90 6 1.6800000 MG/L CU90 - COPPER SUMMARY 09-22-2020 11-05-2020
6M2ND-2020 07-01-2020 12-31-2020 AL 2 exceeding Action Level --- --- CU90 - COPPER SUMMARY 09-22-2020 11-05-2020

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)