CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA4901323 Federal Type : NP
Water System Name : FULTON PROCESSORS, INC. State Type : NTNC
Principal County Served : SONOMA Primary Source :
Status : I Activity Date : 07-09-2010
Distribution System Classification : Max Treatment Plant Classification : There are no treatment plants

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
YR2009 01-01-2009 12-31-2009 90 5 0 MG/L CU90 - COPPER SUMMARY 08-28-2009 08-28-2009
YR2009 01-01-2009 12-31-2009 90 5 0 MG/L PB90 - LEAD SUMMARY 08-28-2009 08-28-2009
YR2008 01-01-2008 12-31-2008 90 5 0.077 MG/L CU90 - COPPER SUMMARY 10-30-2008 10-30-2008
YR2008 01-01-2008 12-31-2008 90 5 0 MG/L PB90 - LEAD SUMMARY 10-30-2008 10-30-2008
6M2ND-2007 07-01-2007 12-31-2007 90 5 0 MG/L PB90 - LEAD SUMMARY 10-04-2007 10-04-2007
6M2ND-2007 07-01-2007 12-31-2007 90 5 0.097 MG/L CU90 - COPPER SUMMARY 10-04-2007 10-04-2007
6M1ST-2007 01-01-2007 06-30-2007 90 5 0 MG/L CU90 - COPPER SUMMARY 03-29-2007 03-29-2007
6M1ST-2007 01-01-2007 06-30-2007 90 5 0 MG/L PB90 - LEAD SUMMARY 03-29-2007 03-29-2007

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)