CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA2400223 Federal Type : NTNC
Water System Name : MINTURN NUT CO., INC. State Type : NTNC
Principal County Served : MERCED Primary Source : GW
Status : A Activity Date : 06-22-2005
Distribution System Classification : D1 Max Treatment Plant Classification : There are no treatment plants

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2020-2022 01-01-2020 12-31-2022 90 5 0 MG/L PB90 - LEAD SUMMARY 07-21-2022 07-21-2022
3Y2020-2022 01-01-2020 12-31-2022 90 5 0.0746 MG/L CU90 - COPPER SUMMARY 07-21-2022 07-21-2022
YR2019 01-01-2019 12-31-2019 90 7 0.1153 MG/L CU90 - COPPER SUMMARY 08-30-2019 08-30-2019
YR2019 01-01-2019 12-31-2019 90 7 0 MG/L PB90 - LEAD SUMMARY 08-30-2019 08-30-2019
3Y2013-2015 01-01-2013 12-31-2015 90 5 0.12 MG/L CU90 - COPPER SUMMARY 07-09-2015 07-09-2015
3Y2013-2015 01-01-2013 12-31-2015 90 5 MG/L PB90 - LEAD SUMMARY 07-09-2015 07-09-2015
6M2ND-2012 07-01-2012 12-31-2012 90 5 0.148 MG/L CU90 - COPPER SUMMARY 10-08-2012 10-08-2012
6M2ND-2012 07-01-2012 12-31-2012 90 5 MG/L PB90 - LEAD SUMMARY 10-08-2012 10-08-2012

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)