CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA5200511 Federal Type : NTNC
Water System Name : BEND ELEMENTARY SCHOOL State Type : NTNC
Principal County Served : TEHAMA Primary Source : GW
Status : A Activity Date : 08-03-2016
Distribution System Classification : D1 Max Treatment Plant Classification : TD

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2020-2022 01-01-2020 12-31-2022 90 5 0 MG/L PB90 - LEAD SUMMARY 09-18-2020 09-18-2020
3Y2020-2022 01-01-2020 12-31-2022 90 5 0.329500 MG/L CU90 - COPPER SUMMARY 09-18-2020 09-18-2020
3Y2013-2015 01-01-2013 12-31-2015 90 5 0.47 MG/L CU90 - COPPER SUMMARY 08-07-2013 08-07-2013
3Y2013-2015 01-01-2013 12-31-2015 90 5 0.008 MG/L PB90 - LEAD SUMMARY 08-07-2013 08-07-2013

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)