CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA4000744 Federal Type : C
Water System Name : AFUERA DE CHORRO WATER COMPANY State Type : C
Principal County Served : SAN LUIS OBISPO Primary Source : GW
Status : A Activity Date : 08-08-2016
Distribution System Classification : D1 Max Treatment Plant Classification : T1

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2021-2023 01-01-2021 12-31-2023 90 6 0.0028 MG/L PB90 - LEAD SUMMARY 07-13-2023 08-29-2023
3Y2021-2023 01-01-2021 12-31-2023 90 6 0.132 MG/L CU90 - COPPER SUMMARY 07-13-2023 08-29-2023
3Y2018-2020 01-01-2018 12-31-2020 90 5 0 MG/L PB90 - LEAD SUMMARY 07-16-2020 07-16-2020
3Y2018-2020 01-01-2018 12-31-2020 90 5 0.145000 MG/L CU90 - COPPER SUMMARY 07-16-2020 07-16-2020
3Y2015-2017 01-01-2015 12-31-2017 90 5 0.013 MG/L PB90 - LEAD SUMMARY 07-10-2017 07-10-2017
3Y2015-2017 01-01-2015 12-31-2017 90 5 0.185 MG/L CU90 - COPPER SUMMARY 07-10-2017 07-10-2017
9Y2011-2019 01-01-2011 12-31-2019 90 5 0.1115 MG/L CU90 - COPPER SUMMARY 07-13-2011 07-13-2011
9Y2011-2019 01-01-2011 12-31-2019 90 5 MG/L PB90 - LEAD SUMMARY 07-13-2011 07-13-2011

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)