CA Drinking Water Watch

Links

PS Code Transition

Water System Details

Water System Facilities  

Monitoring Schedules

Monitoring Results

Monitoring Results By Analyte

Lead And Copper Sampling

Violations/Enforcement Actions

Site Visits

Consumer Confidence Reports

  • Templates
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018

Lead Service Line Documents

Return Links

Water System Search

County Map

Glossary

Contact Info

 

 

Lead and Copper Sample Summary Results Tips on using table


Water System No. : CA4000784 Federal Type : NP
Water System Name : ARROYO GRANDE MUSHROOM FARM State Type : NTNC
Principal County Served : SAN LUIS OBISPO Primary Source : GW
Status : I Activity Date : 09-19-2022
Distribution System Classification : D1 Max Treatment Plant Classification : TD

Click to hide / show columns: MP | MP Begin | MP End | Type | # Samples | Measure | Units | Analyte Code/Name | Begin Sampling| End Sampling

MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
MP * MP Begin MP End Type # Samples Measure Units Analyte Code/Name Begin Sampling End Sampling
3Y2017-2019 01-01-2017 12-31-2019 90 5 0 MG/L PB90 - LEAD SUMMARY 05-08-2019 05-08-2019
3Y2017-2019 01-01-2017 12-31-2019 90 5 0.215 MG/L CU90 - COPPER SUMMARY 05-08-2019 05-08-2019
YR2016 01-01-2016 12-31-2016 90 5 0 MG/L PB90 - LEAD SUMMARY 04-26-2016 04-26-2016
YR2016 01-01-2016 12-31-2016 90 5 0.165 MG/L CU90 - COPPER SUMMARY 04-26-2016 04-26-2016
YR2015 01-01-2015 12-31-2015 90 10 0.315 MG/L CU90 - COPPER SUMMARY 10-27-2015 10-27-2015
YR2015 01-01-2015 12-31-2015 90 10 0.055 MG/L PB90 - LEAD SUMMARY 10-27-2015 10-27-2015
YR2015 01-01-2015 12-31-2015 AL 2 exceeding Action Level --- --- PB90 - LEAD SUMMARY 10-27-2015 10-27-2015

* MP is monitoring period which can be triennial (3Y), annual (YR), 1st six months (6M1ST), or 2nd six months (6M2ND)